User story mapping for Asana

On this page

Bring an Asana project in, lay it out as a journey, then send the plan back. Sections, tasks, subtasks and what's complete all come with it, and every card links back to its task.

The Asana options in the Import menu. The Asana options in the Import menu.12
The Asana options in the Import menu.
  1. 1Asana API fetches the project straight from Asana.
  2. 2Asana CSV reads a CSV file exported from Asana.

Import through the API

  1. 1Choose Menu → Import → Asana → Asana API, or click Asana on the home page.
  2. 2Paste a Personal Access Token. The Get token link opens the page in Asana where you make one.
  3. 3Paste the Project URL or GID, such as the link to the project list.
  4. 4Click Fetch from Asana. Verify Connection checks the details first, if you want to.
The Asana API window, filled in. The Asana API window, filled in.
The Asana API window, filled in.

The API brings in the sections, tasks and subtasks of the project.

Note. Your credentials aren't stored or logged. They go straight to Asana. Your browser remembers the project for next time, but never the token.

Import a CSV file

  1. 1In Asana, export the project as CSV. The import dialog shows the way: Project > ... > Export/Print > CSV.
  2. 2In the story map, choose Menu → Import → Asana → Asana CSV.
  3. 3Drop the file in, or click to pick it.
  4. 4Click Continue.
The Asana CSV window. The Asana CSV window.
The Asana CSV window.

The file needs a Name column. Subtasks come in under their parent task, matched by name.

Review the import

Review Import lists every card that will be made: each group, then its tasks, and last the tasks that belong to no group.

The review list, the same for the API and a CSV file: each parent task, then its subtasks. The review list, the same for the API and a CSV file: each parent task, then its subtasks.
The review list, the same for the API and a CSV file: each parent task, then its subtasks.

When the project has two or more sections, Tag by picks how the tasks group:

  • Group by sections makes each section a group, with its tasks under it. Subtasks aren't imported.
  • Group by tasks & subtasks makes each task with subtasks a group, with its subtasks under it. Tasks with no subtasks come last.

Untick any row to leave it out. Untick a group and its tasks go with it. Status ticks or unticks every task with that status, and the box at the top of the list ticks or unticks everything. The count at the bottom shows what's going in.

Importing into a story map you've worked on asks Where should the cards go?

  • Add to this story map puts the imported cards in a slice called Imported, under the steps you already have. If no step has a name yet, they go beside what's there.
  • Replace this story map swaps the whole story map for the import, and asks first.

Either way, a backup is taken before anything changes. The button at the bottom names the one you chose: click Add to story map or Replace story map to finish.

A new story map that nobody has worked on isn't asked. The import fills it, and the button reads Import to Map.

What you get on the story map

The cards land in a slice called Imported, under a blank backbone. A new story map also gets an empty slice above it, with no name, for your first release.

  • Groups become lime green cards, tagged section-01 or parent-01 and so on. Delete the ones you don't need.
  • Tasks under a group become cards tagged to match it. Tasks in no group get no tag.
  • Notes go in the body of the card.
  • Complete tasks are marked done, and the rest planned.
  • Links open the task in Asana.

The legend names the two colours, such as Section and Task.

The cards fill up to eight columns from left to right, each group followed by its tasks. The tags keep them together: search and filter by section-01 to see one group at a time.

Build the backbone first

When the import finishes, a short guide lights one thing at a time:

  1. 1Name the user: who the product is for.
  2. 2Name the activity: what they are trying to do.
  3. 3Name the steps they take, from left to right. Enter moves to the next step, and adds another after the last. Press Enter on an empty step when the journey is done.
  4. 4Drag each card up out of Imported into a slice, under the step it belongs to. Select several cards to move them together.
The guide starts with who the product is for. Everything else is dimmed. The guide starts with who the product is for. Everything else is dimmed.
The guide starts with who the product is for. Everything else is dimmed.

The backbone ends up with exactly the steps you named. Steps left blank are taken away, and the imported cards are dealt again under the ones that are left.

The zoom buttons work while the guide is open. Skip the guide closes it, and a part of the backbone that already has a name is left out. Delete the Imported slice when it's empty. Define the story map backbone has more.

The backbone is named, and the imported cards sit underneath it. The backbone is named, and the imported cards sit underneath it.
The backbone is named, and the imported cards sit underneath it.

Export to Asana

Every card becomes one task. No parent tasks, subtasks or sections are made: the story map keeps the structure, and each task carries its slice and step.

The Asana options in the Export menu. The Asana options in the Export menu.12
The Asana options in the Export menu.
  1. 1Asana API creates the tasks in Asana for you.
  2. 2Asana CSV downloads a file for you to import in Asana.

Choose Menu → Export → Asana, then one of them. Both start the same way:

  1. 1Under Releases, tick the slices to send.
  2. 2Under Status, tick the statuses to send.
  3. 3Leave Export task cards only ticked to send the yellow task cards and any card with a status. Untick it to send cards of every colour, such as notes and questions.
  4. 4Open Choose cards to untick single cards.
  5. 5Check What each card becomes. It shows one card and the task it turns into.
  6. 6Untick what you don't want to send with each task: Slice name, Step name or Card tags.
This part is the same whichever way you export: one card and the task it becomes in Asana. This part is the same whichever way you export: one card and the task it becomes in Asana.
This part is the same whichever way you export: one card and the task it becomes in Asana.

The description of each task is the card body, then the slice, the step and a link back to the card.

Asana API

  1. 1Click Connect to Asana.
  2. 2Paste a Personal Access Token and the Project Page URL.
  3. 3Click Export to Asana.
The Asana API window after you click Connect to Asana. The Asana API window after you click Connect to Asana.
The Asana API window after you click Connect to Asana.

The slice, the step and the card tags become Asana tags, lower case with hyphens, such as mvp and browse-menu. The export uses tags the workspace already has and makes the missing ones.

The progress list links to every task as it's made. Cards marked done are created complete. One export takes up to 2,000 cards.

Asana CSV

Click Download CSV, then import the file into your Asana project. The dialog shows the way: click the project name dropdown, then Import, then CSV.

The Asana CSV window, with Download CSV at the bottom. The Asana CSV window, with Download CSV at the bottom.
The Asana CSV window, with Download CSV at the bottom.

Asana can't import tags from a file, so the slice, the step and the tags each go in a column of their own: Slice, Step and Tags. Asana turns each column into a custom field in the project.